{"id":32450,"date":"2026-10-07T14:22:06","date_gmt":"2026-10-07T06:22:06","guid":{"rendered":"https:\/\/www.curtin.edu.au\/news\/?post_type=oasis-news&#038;p=32450"},"modified":"2026-10-07T14:22:18","modified_gmt":"2026-10-07T06:22:18","slug":"pathway-upgrade-between-building-400-and-multideck-carpark-pe2","status":"publish","type":"oasis-news","link":"https:\/\/www.curtin.edu.au\/news\/oasis-news\/pathway-upgrade-between-building-400-and-multideck-carpark-pe2\/","title":{"rendered":"Pathway Upgrade \u2013 between Building 400 and Multideck Carpark (PE2)"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><em>Reading time: 1 minute<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>From 12 October to 1 November<\/strong>, we are improving the pathway in front of <strong>Building 400<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How will this impact you?<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Pedestrians will need to use the PE3 laneway, meaning <strong>drivers and pedestrians must both be careful <\/strong>during this time.<\/li>\n\n\n\n<li>Most of the <strong>PE3 carparking bays will remain available.<\/strong><\/li>\n\n\n\n<li>During each stage, <strong>ACROD bays in PE3 <\/strong>will temporarily close. Alternative <strong>ACROD parking is available in PF1<\/strong>.<\/li>\n\n\n\n<li>Please read and follow the signs that are in place.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Work will happen in stages from 12 October to 1 November. The map below shows location and dates.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1374\" height=\"1061\" src=\"https:\/\/www.curtin.edu.au\/news\/wp-content\/uploads\/2026\/10\/B408-Map-Enabling-Works-NEWEST@3x-1.png\" alt=\"Map shows building 400 and surrounding buildings. Work stages are listed as: Stage 1: 2x ACROD bays closed from 12 October - 20 October \nStage 2: 4x ACROD bays closed from 21 October - 28 October\nStage 3: 6x ACROD bays closed from 29 October - 1 November \nAlternative ACROD parking is available in PF1.\" class=\"wp-image-32456\" srcset=\"https:\/\/www.curtin.edu.au\/news\/wp-content\/uploads\/2026\/10\/B408-Map-Enabling-Works-NEWEST@3x-1.png 1374w, https:\/\/www.curtin.edu.au\/news\/wp-content\/uploads\/2026\/10\/B408-Map-Enabling-Works-NEWEST@3x-1-768x593.png 768w\" sizes=\"auto, (max-width: 1374px) 100vw, 1374px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Thank you for your patience and cooperation during this time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Reading time: 1 Minute. From 12 October to 1 November, we are improving the pathway in front of Building 400. Some parking will be affected during this time. <\/p>\n","protected":false},"author":4496,"featured_media":32458,"template":"","meta":{"_acf_changed":false,"_oasis_is_in_workflow":0,"_oasis_original":0,"_oasis_task_priority":"","_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"8223,6942,5115,4983,7622,8309","_relevanssi_noindex_reason":"","wds_primary_oasis-categories":0,"footnotes":""},"oasis-categories":[137,140,146],"class_list":["post-32450","oasis-news","type-oasis-news","status-publish","has-post-thumbnail","hentry","oasis-categories-important","oasis-categories-on-campus","oasis-categories-student-life"],"acf":{"post_options":{"":null,"banner":{"image":false}}},"featured_image":"https:\/\/www.curtin.edu.au\/news\/wp-content\/uploads\/2026\/10\/B400-Map-2026-1588x500.jpg","author_meta":{"first_name":"Maddie","last_name":"Bird","display_name":"Maddie Bird"},"_links":{"self":[{"href":"https:\/\/www.curtin.edu.au\/news\/wp-json\/wp\/v2\/oasis-news\/32450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.curtin.edu.au\/news\/wp-json\/wp\/v2\/oasis-news"}],"about":[{"href":"https:\/\/www.curtin.edu.au\/news\/wp-json\/wp\/v2\/types\/oasis-news"}],"author":[{"embeddable":true,"href":"https:\/\/www.curtin.edu.au\/news\/wp-json\/wp\/v2\/users\/4496"}],"version-history":[{"count":0,"href":"https:\/\/www.curtin.edu.au\/news\/wp-json\/wp\/v2\/oasis-news\/32450\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.curtin.edu.au\/news\/wp-json\/wp\/v2\/media\/32458"}],"wp:attachment":[{"href":"https:\/\/www.curtin.edu.au\/news\/wp-json\/wp\/v2\/media?parent=32450"}],"wp:term":[{"taxonomy":"oasis-categories","embeddable":true,"href":"https:\/\/www.curtin.edu.au\/news\/wp-json\/wp\/v2\/oasis-categories?post=32450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}